 Chronologic order..

02-01-1887

Archive done by Joan Casas and Enric Heriz, projecting the San Feliu de Guixols railroad in Gerona.


Portrait of Joan Casas i Arxer, projector of the train
Sant Feliu de Guíxols town archive


Black and white postcard of the old Sant Feliu pier (Sant Feliu de Guixols town archive)


Early trip on the San Feliu convoy. (Town archive of San Feliu de Guixols)


South entrance of the San Feliu Station near 1910  (Town archive of San Feliu de Guixols)

Family portrait (Picture taken from Ignasi Griñón historic archive)


Photo of the train and the Palamos road (Picture taken from the Sant Feliu de Guíxols town archive)


The Llagostera station during the heavy snowing near 1962. Picture taken by J. Vall-llosera


Locomotive 4, A6 model next to the coal loading dock (in the distance the tower of the Eres). Picture taken to the Sant Feliu de Guíxols town archive,

09-01-1889

Completion of a definitive project started by Carles Cardenal, MZA engineer.

15-04-1889

An early Anonymous Railroad Company of San Feliu is started with a 1.536.100 pesetas social budget in Gerona.

1889

The company starts a railroad expansion taking "la Llagostera" as a starting point.

1890

The mobile equipment is already ordered.

01-1891

M. Jean Mettewi, as the one who put the Tranvia del aix rails on "El Empordà" three years ago, starts deploying rails.

02-1891

The first locomotives start arriving from Germany along with more mobile equipment.

06-08-1891

The first test drive is made at 30 km/h.

01-1892

The mobile equipment ordered is complete now with the last equipment delivery.

24-06-1892

Joan Casas gets an official permission from Madrid to travel to San Feliu from Gerona, with the convoy making all of the planned stops.

29-06-1892

The project recieves eclesiastic blessing.

30-06-1892

The first comercial drive starts its service at 05:01 AM.

1895

A new convoy starts its service between Amer and Salt in Olot. A possible shared station was thought.

1898

During the Cuba war, the recession decreases the railroad productivity.

1903

The benefits and losses are balancing again..

1904

The pier starts its construction. A locomotive is orderd, along with 2 baggage cars and 15 more cars. In San Feliu, a new structure is built for locomotive storage.

16-11-1908

30-12-1908

The heavy rain leaves moderate overall damage, but specially on the bridges that endured the river flow enormous increase.

5/6-11-1912

A solidary strike takes place in response to the one started in M.Z.A.

19-12-1913

The Ridaura bridge that was damaged by the heavy rains that took place on 1908 is replaced.

1914

The railroad recieves a decrease on passengers because of the repetitive bad weather with snowing. In addition, the first world war takes place and the external markets are closed.

1915

The amount of passengers start to increase because of the switching between the Puerto and M.Z.A. stations in Gerona..

1918

Thirtheen new platforms are bought.

14-08-1918

A new dependence is approved. It would connect the pier with the Sant Feliu station.

1924

The most recent dependence is opened, but most importantly, the linguistic repression that kept asking for a change in the names of the stations comes to an end. The DGOP ended the repression with a final resolution that enabled the stations to keep their names regardless of the use that they recieved.

años 20

Two big locomotives (11 and 12) are received along with 17 big size cars.

1927

A new record on comercial traffic is set with 52.114 Tm.

años 30

The globla crysis is starting to hit the railroad productivity with the decreased comercial use.

18-07-1936

With the start of the Spanish civil war, the service stops for a few days.

23-07-1936

The railroad is practicaly stolen by the regional railroad comitee.

 

The bridge over the Verneda river is destroyed by the republican troops as they retired.

1939

With the new restrictions, 19 employees are fired and with the end of the war, the service is restarted with only 1 convoy and 2 roads.

1940

With the completion of the new bridge a increase of the comercial traffic is noticed.

1942

50th aniverary.

1943

The legal problems regarding payments come to an end with the help of a judge of La Bisbal.

1944

The traffic recieves a progressive increase and the railroad reaches a few saturation points.

1946

This year, the railroad manages to transport 508.306 passangers, thus setting a new record. A new locomotive (nº 20) coming from El Baix Empordà is deployed.

1947

A petition to the state is made, asking for an extra budget.

21-04-1949

The state gives birth to a law helping the small roads railroads. Furthermore, a new shared station in Olot-Gerona is being planned.

1950

The traffic receives a decrease due to the everlasting automobile use increase.

1951

A new extra budget is received to help keep up with the debt.

1953

The bigger locomotives (11 and 12) are rented to a factory in Mieres.

1956

The Baix Emporda tramway is closed.

1957

Two locomotives are finally sold to the factory of Mieres.

1959

The railroad unificates with the Olot-Gerona railroad. They now posses 3 managers per company and 3 statal managers.

15-10-63

The state takes control of the railroads that have too much debt.

middle 60

Two special locomotives coming from Castellon are bought (5 and 7) with a Compound system.

1966

Sofrerail studies the railroad viability.

10-04-69

The San Feliu to Gerona railroad ceases its activity.

15-07-69

The Olot to Gerona railroad ceases its activity.

 

Please send me an email if you find new historic-related information regarding the San Feliu railroad and I will have the pleasure of contacting you.