|
|
|
Chronologic order..
|
|
02-01-1887
|
Archive done by Joan Casas and Enric Heriz, projecting the San Feliu de Guixols railroad in Gerona.
|
 Portrait of Joan Casas i Arxer, projector of the train Sant Feliu de Guíxols town archive
 Black and white postcard of the old Sant Feliu pier (Sant Feliu de Guixols town archive)
 Early trip on the San Feliu convoy. (Town archive of San Feliu de Guixols)
 South entrance of the San Feliu Station near 1910 (Town archive of San Feliu de Guixols)
Family portrait (Picture taken from Ignasi Griñón historic archive)
 Photo of the train and the Palamos road (Picture taken from the Sant Feliu de Guíxols town archive)
 The Llagostera station during the heavy snowing near 1962. Picture taken by J. Vall-llosera
 Locomotive 4, A6 model next to the coal loading dock (in the distance the tower of the Eres). Picture taken to the Sant Feliu de Guíxols town archive,
|
|
09-01-1889
|
Completion of a definitive project started by Carles Cardenal, MZA engineer.
|
|
15-04-1889
|
An early Anonymous Railroad Company of San Feliu is started with a 1.536.100 pesetas social budget in Gerona.
|
|
1889
|
The company starts a railroad expansion taking "la Llagostera" as a starting point.
|
|
1890
|
The mobile equipment is already ordered.
|
|
01-1891
|
M. Jean Mettewi, as the one who put the Tranvia del aix rails on "El Empordà" three years ago, starts deploying rails.
|
|
02-1891
|
The first locomotives start arriving from Germany along with more mobile equipment.
|
|
06-08-1891
|
The first test drive is made at 30 km/h.
|
|
01-1892
|
The mobile equipment ordered is complete now with the last equipment delivery.
|
|
24-06-1892
|
Joan Casas gets an official permission from Madrid to travel to San Feliu from Gerona, with the convoy making all of the planned stops.
|
|
29-06-1892
|
The project recieves eclesiastic blessing.
|
|
30-06-1892
|
The first comercial drive starts its service at 05:01 AM.
|
|
1895
|
A new convoy starts its service between Amer and Salt in Olot. A possible shared station was thought.
|
|
1898
|
During the Cuba war, the recession decreases the railroad productivity.
|
|
1903
|
The benefits and losses are balancing again..
|
|
1904
|
The pier starts its construction. A locomotive is orderd, along with 2 baggage cars and 15 more cars. In San Feliu, a new structure is built for locomotive storage.
|
|
16-11-1908
30-12-1908
|
The heavy rain leaves moderate overall damage, but specially on the bridges that endured the river flow enormous increase.
|
|
5/6-11-1912
|
A solidary strike takes place in response to the one started in M.Z.A.
|
|
19-12-1913
|
The Ridaura bridge that was damaged by the heavy rains that took place on 1908 is replaced.
|
|
1914
|
The railroad recieves a decrease on passengers because of the repetitive bad weather with snowing. In addition, the first world war takes place and the external markets are closed.
|
|
1915
|
The amount of passengers start to increase because of the switching between the Puerto and M.Z.A. stations in Gerona..
|
|
1918
|
Thirtheen new platforms are bought.
|
|
14-08-1918
|
A new dependence is approved. It would connect the pier with the Sant Feliu station.
|
|
1924
|
The most recent dependence is opened, but most importantly, the linguistic repression that kept asking for a change in the names of the stations comes to an end. The DGOP ended the repression with a final resolution that enabled the stations to keep their names regardless of the use that they recieved.
|
|
años 20
|
Two big locomotives (11 and 12) are received along with 17 big size cars.
|
|
1927
|
A new record on comercial traffic is set with 52.114 Tm.
|
|
años 30
|
The globla crysis is starting to hit the railroad productivity with the decreased comercial use.
|
|
18-07-1936
|
With the start of the Spanish civil war, the service stops for a few days.
|
|
23-07-1936
|
The railroad is practicaly stolen by the regional railroad comitee.
|
|
|
The bridge over the Verneda river is destroyed by the republican troops as they retired.
|
|
1939
|
With the new restrictions, 19 employees are fired and with the end of the war, the service is restarted with only 1 convoy and 2 roads.
|
|
1940
|
With the completion of the new bridge a increase of the comercial traffic is noticed.
|
|
1942
|
50th aniverary.
|
|
1943
|
The legal problems regarding payments come to an end with the help of a judge of La Bisbal.
|
|
1944
|
The traffic recieves a progressive increase and the railroad reaches a few saturation points.
|
|
1946
|
This year, the railroad manages to transport 508.306 passangers, thus setting a new record. A new locomotive (nº 20) coming from El Baix Empordà is deployed.
|
|
1947
|
A petition to the state is made, asking for an extra budget.
|
|
21-04-1949
|
The state gives birth to a law helping the small roads railroads. Furthermore, a new shared station in Olot-Gerona is being planned.
|
|
1950
|
The traffic receives a decrease due to the everlasting automobile use increase.
|
|
1951
|
A new extra budget is received to help keep up with the debt.
|
|
1953
|
The bigger locomotives (11 and 12) are rented to a factory in Mieres.
|
|
1956
|
The Baix Emporda tramway is closed.
|
|
1957
|
Two locomotives are finally sold to the factory of Mieres.
|
|
1959
|
The railroad unificates with the Olot-Gerona railroad. They now posses 3 managers per company and 3 statal managers.
|
|
15-10-63
|
The state takes control of the railroads that have too much debt.
|
| middle 60 |
Two special locomotives coming from Castellon are bought (5 and 7) with a Compound system.
|
|
1966
|
Sofrerail studies the railroad viability.
|
|
10-04-69
|
The San Feliu to Gerona railroad ceases its activity.
|
|
15-07-69
|
The Olot to Gerona railroad ceases its activity.
|
|
Please send me an email if you find new historic-related information regarding the San Feliu railroad and I will have the pleasure of contacting you.
|